Hello All,
I am trying to install Ax 2012 on a test server with the following specifications:
Server Model: HP DL 350 g5
CPU: Intel Xeon E5420 2.5 GH
Memory 4GB
250 GB of free storage
I installed the database,complete server components and of cource client components. Installation completed successfully without an error.
the initialization and configuration wizard is in the database syncronization phase and it's been running for more than 6 hours. is this a normal ?
at the moment the server cpu is almost idle and the system is showing that 92% of the physical memory is used and the page file size is 3.7 GB, do I need to install more memory?
Please note during the installation phase, I select foundation label model