I'm running a RDC with an AX client. In production control, operation scheduling of a production order has the wrong "scheduling date" (see below).
Today's Date is March 27 2013, but the system chose a date previous to today's date. What is causing this and how would I be able to default to today's date
When I'm running scheduling? All capacity are scheduled correctly.
Thanks,