MRP batch with 10 helpers on 3 different batchserver

$
0
0

Hi,

we're live with Dynamics AX 2012 for 2 months now but we have a lot of with our MRP run

- Sometimes the run takes 30 minutes, next day it can be 4 - 8 houres

-Sometimes the run ends with status ended BUT it isn't ended at all, the run has interupted and no orders were created.

- Mostly, the run has to be done twice because the first time there are some errors. It can also be that the run has to be done 5 times before it succeed.

Are there some methods to troubleshoot this?Thx