Hi,
I'm using AX 2012 R2 and was wondering why the Post Dated Check link is missing in General ledger Parameters..
I already checked the License Configuration & the Post dated check is marked.
Any idea why? Help please..
Thanks,
Bella
Hi,
I'm using AX 2012 R2 and was wondering why the Post Dated Check link is missing in General ledger Parameters..
I already checked the License Configuration & the Post dated check is marked.
Any idea why? Help please..
Thanks,
Bella