Setting production resources machine, mold and tools

$
0
0

Dear AX Experts,

Does anyone can explain how to configure production resources in AX 2012 to meet our requirement below, in plastic industries; we are using molds, machines and tools as resources in production.

 

I.e. Product “A”, has two mold, so we can produce product “A” using mold Mold-A1 or Mold-A2

 

“Mould-A1” only runs on machines below

ARB2202

KM300

ARB-9

KM3002

KM3003

 

“Mould-A2” only runs on machines below         

ARB-8

ARB-9

ARB-10

ARB-11

ARB-12

ARB100

ARB1005

ARB1004

 

In the example above each mold have specific machines to run on, both mold can run on “ARB-9” but most of them have different machine. 

 

Each machines has their own tools, and some tools is interchangeable with other machines same type of the machines

 

I.e. ARB-9 has tools “ARB-Tool1” & “ARB-Tool2” these tools can be use as tools in other “ARB machines”

 

Question:

-It is possible to user AX 2012 to handle above case?

-How to configure it?

 

Any suggestions would be greatly appreciated :)

Thank you