Quantcast
Channel: Microsoft Dynamics AX Forum - Recent Threads
Viewing all articles
Browse latest Browse all 73760

Master Scheduling with multi thread stop by serious error

$
0
0

Hi

Now, we are testing the masterplan of ax 2009 in our customer site. And we have serious problem with the master scheduling.
- Master scheduling is executed by batch mode.(we use multi-thread)
- We made some customization on the master scheduling

When we executed master scheduling, the batch job of master scheduling stops with following serious error messages.
- Cannot create a record in Scheduling process items list(ReqProcessItemList).Scheduling Process: 00229751_001. 379.The record already exists.
- It appears that at least one of the threads (Thread id: 00229801_001) has gone into an infinite loop, abandoning the process
- Main process has been marked as crashed

We have to fix this problem as soon as possible. If anyone have any idea of solution about this problem, please inform me.

Thanks

 


Viewing all articles
Browse latest Browse all 73760

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>