HI Everyone,
The scenario is this. We have an AX 2012 in one machine : AOS, Client, SSRS, SSAS, EP and Help all in one server. The database for this AX is on a remote server running on a Production level hardware.
On this single AX 2012 server, we have allocated Dynamics Memory from 4 GB to 32 GB of RAM. When I looked at the performance via Task Manager, the entire server is only eating up 6.77 GB of RAM. The server, was allocated with 11.1 GB of RAM ( Control Panel > System).
The problem is performance, the response is still slow despite of allocating more resources. Is there anyway / we missed on AX Client, AOS for it to utilize the resources allocated to it?
Cheers!